Residential Service · Toronto & GTA

Electrical Panel Upgrades for Toronto Homes

Power up your home with a safer, modern electrical panel. ESA-licensed electricians serving Etobicoke, Toronto, and the GTA — from 100-amp upgrades to full fuse panel replacements and EV charger prep.

Do You Need One?

Six signs your home needs a panel upgrade

Most Toronto homes built before 1980 are running on panels that weren't designed for today's electrical loads. Here's how to tell if yours is overdue.

01

Breakers trip often

Frequent tripping means your panel can't handle the load.

02

Lights flicker or dim

Especially when the AC, dryer, or oven kicks on.

03

You still have a fuse box

Fuse panels are outdated and a known insurance red flag.

04

You're adding an EV charger

Most older panels need an upgrade before a 240V charger.

05

Burning smell or warm panel

A safety emergency — call us immediately.

06

Renovating or adding on

New circuits often max out an existing 100A panel.

What We Do

Three types of panel upgrades

Whether you're modernizing an older home, swapping out a fuse box, or prepping for an EV, we handle the full job from permit to ESA inspection.

100A → 200A Upgrades

Double your home's electrical capacity. Ideal for renovations, additions, and households with high-draw appliances like induction ranges and heat pumps.

Fuse Panel Replacement

Replace outdated fuse boxes with modern breaker panels. Required by most home insurers and a major safety upgrade for homes built before 1965.

EV Charger Prep

Get your panel ready for a Level 2 home charger. We handle the load calculation, permit, panel upgrade, and 240V circuit install in one visit.

Our Process

From quote to inspection in four steps

01

Free quote

On-site or virtual assessment of your existing panel and load needs.

02

Permits filed

We pull the ESA permit and coordinate with your utility — no paperwork on your end.

03

Install day

Most upgrades take 6–8 hours with a brief power shutoff window.

04

ESA inspection

We're on-site for the inspection and you get a Certificate of Acceptance.

Why GTA homeowners choose Amps

ESA

Licensed Electrical Contractor in Ontario

$5M

Liability insurance on every job

10+

Years serving Toronto & the GTA

5★

Average Google rating from local clients

FAQ

Panel upgrade questions, answered

How long does a panel upgrade take?

Most residential panel upgrades take a single day — typically 6 to 8 hours of work with a power shutoff window of 3 to 5 hours. ESA inspection is scheduled separately, usually within 1–2 weeks.

Do I need a permit for a panel upgrade in Toronto?

Yes — every panel upgrade in Ontario requires an ESA (Electrical Safety Authority) permit and inspection. We handle all permit paperwork as part of our service.

Will my power be off the entire time?

No — only during the actual panel swap, which is typically 3 to 5 hours. We coordinate the timing with you in advance and try to schedule it for minimal disruption.

How much does a panel upgrade cost?

Pricing varies based on panel size, location, and any wiring or grounding work needed to bring the system up to current code. We provide a detailed quote after a free site assessment.

Do I need 200 amps if I'm getting an EV charger?

Not always. We run a load calculation first — many homes with 100A service can support a Level 2 charger using load management. If a panel upgrade is needed, we'll explain why before you commit.

Will a panel upgrade affect my home insurance?

Almost always positively — replacing a fuse box or upgrading from 60A or 100A service often qualifies you for lower premiums, and many insurers in Ontario require it for older homes.

Ready to upgrade your panel?

Free quotes, ESA-licensed work, and a fixed timeline you can plan around. Serving Etobicoke, Toronto, and the GTA.